RM GCSE Deadlines
- 11th July 2014 - CA1 (Criterion 1)
- Research and Specification
- 19th September 2014 - CA2a (Criterion 2 up to Initial ideas)
- Range of potential designs with partial development of 3 of them
- 17th October 2014 - CA2b (Criterion 2)
- Developed design with construction and material details, scale model,final
design drawing, planning, materials cutting list - 5th December 2014 - CA3a (Criterion 3 half way)
- Manufacturing checkpoint -all parts should now be shaped and should fit together
- 13th February 2015 - CA3b (Criterion 3) Manufactured Item completed
- 6th March 2015 CA4 - (Criterion 4) final hand in.
- Testing and evaluation